Installation Guide

(figure 4)
(figure 5)
7.
Apply plumbers putty to the Washer and slide
it over the bottom of the Drain Body (gure 3).
8. Slide the paper washer over the drain body.
9.
Attach the Drain Body Nut on the Drain
Body and tighten until the Nut and Washer
have created a seal with the bottom of the
bathtub. DO NOT OVERTIGHTEN (figure 4).
PREPARE TAIL PIECE
All parts involved in tail piece installation are
provided by the installer.
10. Drain waste vent must always be installed
according to local standard. Verify the
placement of the bathtub before drilling the
hole for the drain waste vent.
11. Install 1 1/2 tail piece over the
drain waste vent.
12. Cut tail piece to desire
d length (will vary for
each installation).
13. Slide tail piece nut over tail piece towards
flanged end.
14. Connect tail piece assembly to waste vent.
15. Place flange washer on top of tail piece.
(figure 5).