Instructions / Assembly

WC-AT102340P11
For easy installation read these instructions carefully.
1
2
3
Tighten the nut and
fasten the seat.
Adjust all screws and
keep it level.
Hot
Hot
Cold
Cold
Two outlets
Valve platform
1
2
When inserting the valve into the oor,
check the location of outlets and
the bath (see g).
Glue the tile and leave
the hole ø75-ø89.
Remove the safe cover.
4
9 8
Insert the main body
into the seat, tighten
the nut and cover the
escutcheon.
5
6
7
Floor or bath platform
(A platform may be built by
the installer or the valve is
installed in the oor)
Floor or bath platform
(A platform may be built by
the installer or the valve is
installed in the oor)
Floor or bath platform
(A platform may be built by
the installer or the valve is
installed in the oor)
3