Tub Filler Installation Instructions WC-AT102340P11
All information is based on the latest product information available at the time of publication. Product characteristics, packaging, and availability may change at any time without notice. Installers, please keep these instructions for the consumer. They contain important information. ATTENTION 1 The cartridges in the main body have been tested and adjusted by the factory. Do not take the cartridges apart. 2 A platform may be built by the installer. No platform is included.
ROUGH-IN DIMENSIONS 12-1/2” 9” 3” ø1-1/8” 8-1/4” Hose Length is 58-1/2” 37-3/8” 31-1/8” 30-3/4” 25-5/8” ø2” ø3-1/2” 3 - ø 7/16” 1” 2-7/8” Min 2-3 /8” 1-7/8” 1/2”-14NPT 3 - ø1/2” Min ø4-1/2” OPERATION INSTRUCTIONS WC-AT102340P11 3-3/8”
For easy installation read these instructions carefully. 1 Tighten the nut and fasten the seat. 2 1 Adjust all screws and keep it level. 3 Valve platform Two outlets Floor or bath platform (A platform may be built by the installer or the valve is installed in the floor) Hot Hot Cold When inserting the valve into the floor, check the location of outlets and the bath (see fig). Cold 2 Glue the tile and leave the hole ø75-ø89. 5 Remove the safe cover.