Installation Guide

Installation Guide
WC-2626-72-DBL
2
Unpack the handles and install them on the vanity. Do not
over tighten when attaching.
Install the counter. Seal around the top of the cabinet with
clear silicone sealant. Do not over apply. Allow to dry 24
hours for proper curing.
4
1
The handles are safely stored for transport in a box inside
of the cabinet. Look inside the vanity for the box with your
handles.
INSTALLATION INSTRUCTIONS
Short screws are for the door handles and long screws are
for the drawer handles.
3
Short, for door handles Long, for drawer handles