Installation Guide

WC-2020-60-SGL
Installation Guide
6-8mm
(a)
(b)
(c)
INSTALLATION INSTRUCTIONS
1
Installer must cut appropriately sized hole
in back of cabinet to accomodate existing
placement of hot & cold wall valves & drains.
2
Adjust the adjustable feet according to the
floor.
5
Install the screws into the wall anchors,
leaving enough of the screw exposed to hang
the mirror - approx 1/4” - 1/2”.
6
Remove the handles from inside the cabinet
doors and drawers and reinstall on the
outside. Do not over tighten when reattaching.
3
Install the counter. Seal around the top of the
cabinet with clear silicone sealant. Do not over
apply. Allow to dry 24 hours for proper curing.
Cut hole in back
of cabinet
4
Install the mirror: a)use a pencil to mark the
placement of the screw holes on the wall,
b)drill holes, c)insert the plastic wall anchors.