Installation Guide

WC-CG8000-80
OVERMOUNT INSTALLATION
INSTALLATION INSTRUCTIONS
1 Installer must cut appropriately sized hole in back
of cabinet to accommodate existing placement of
hot&cold wall valves and drains
2 Install the counter and pop-up
drain. Seal around the top of cabinet
with clear or white silicone sealant.
3 Install the sink and pop-up drain.
Seal around the base of the sink with
clear or white silicone sealant.
4 Attach mirror brackets to wall
with supplied screws. Hang mirrors.