Installation Guide

WC-WHE009-60-SGL
Overmount Installation Guide
Prior to installation please check received
items against the "Packing List".
Please report any missing items to your
retailer immediately.
Professional installation recommended.
Protect all surfaces from sharp objects,
high heat sources,direct prolonged
sunlight and chemical hazards.
60″
PACKING LIST
INSTALLATION AND ADJUSTMENT OF HINGES
REQUIRED TOOLS NOT IN BOX
12
300m
m
"
-
CH
N
Main cabinet / 1 Counter / 1 Sink / 1
Install screws
and cover / 4
Install screws / 16
Metal bracket / 4
install
Tape Measure Pencil Electric Drill Phillips Screwdriver Adjustable Wrench Spirit Level Silicone sealant
remove
adjust height adjust laterally adjust depth
OPTIONAL OPTIONAL
INSTALLATION INSTRUCTIONS
1 Drill holes to match
stud placement in wall.
2 Installer must cut appropriately sized
hole in back of cabinet to accomodate
existing placement of hot&cold wall valves
and drain
5 Install the counter.
Seal around the top of
cabinet with clear or white
silicone sealant
6 Install the sink
and pop-up drain. Seal
around the base of the sink
with clear or white silicone sealant.
3 Matching holes may be predrilled
in wall
4 Attach vanity to wall.

Summary of content (1 pages)