Certificate Of Compliance

HBCS Report # EMC_12003 Page 7 of 36
EQUIPMENT CONFIGURATION
1. Overview
H.B Compliance Solutions was contracted by PI Engineering to perform testing on the X-Keys
XK-16 under the purchase order number 012312PVE.
This document describes the test setups, test methods, required test equipment, and the test
limit criteria used to perform compliance testing of the PI Engineering, X-Keys XK-16.
The tests were based on EN 55022 & EN 55024 standards. The tests described in this document
were formal tests as described with the objective of the testing was to evaluate compliance of
the Equipment Under Test (EUT) to the requirements of the aforementioned specifications. PI
Engineering should retain a copy of this document and it should be kept on file for at least five
years after the manufacturing of the EUT has been permanently discontinued. The results
obtained relate only to the item(s) tested.
Product Name: PI Engineering Inc.
Model(s) Tested: XK-0981-UCK16
Supply Voltage Input: 5Vdc
Test Item: Pre-Production
Environmental Test
Conditions:
Temperature: 15-35⁰C
Humidity: 30-60%
Barometric Pressure: 860-1060 mbar
Modification to the EUT: None
Evaluated By: Staff at Emerson Network
Test Date(s): 02/07/12 – 02/23/12
2. Test Facility
All testing was performed at Emerson Network Power. This facility is located at 2900 S. Diablo
Way, Suite 190, Tempe, AZ 85282. All equipment used in making physical determination is
accurate and bears recent traceability to the National Institute of Standards and Technology.
Test facility at Emerson Network power is an A2LA accredited test site. The A2LA certificate
number is 2716.01. The scope of accreditation covers the FCC Method - 47 CFR Part 15, ICES-
003, CISPR 22, AS/NZS 3548 and VCCI
Radiated Emissions measurements were performed in a semi-anechoic chamber (equivalent to
an Open Area Test Site). In accordance with §2.948(a)(3), a complete site description is
contained at Emerson Network Power.