Specifications

Edge-AI Vibration Sensor
8
5. Use of Device
5.1. Steps for usage
1) The installation environment is well covered by ZETA network in
advance, so that the equipment can enter the network smoothly
afterwards;
2) Before powering on the device, first add the device to the FM Platform,
as shown in the figure:
3) Power on the equipment and wait for the equipment to go online, and
at the same time install the equipment to the selected installation point
of the rotating machinery to be tested;
4) After the device is online, you need to enable the required functions
(default is off), such as bearing, rotor, gear fault detection, etc.;
5) Diagnostic parameter settings. For different mechanical equipment,
different parameter information needs to be set according to the
conditions of the mechanical equipment. For the setting guidelines,
please refer to Chapter 3.3.