Manual
Commissioning ProLab 2000
20
ba75577e05 11/2013
3.3 Initial commissioning
Perform the following activities:
Insert the batteries (see page 97)
Connect the power pack (see page 19).
Switch on the meter (see page 21)
Set the language (see page 25)
Set the date and time (see page 27)
Set up the access authorization for electronic keys (see page 29)