Instructions / Assembly
6
An ASSA ABLOY Group brand
P/N AYRT-210-INST-FUL Rev E
1. Install latch in door, securing with two (2) M4 x 25.4mm
screws supplied (Fig. 1).
2. Install strike plate on the door frame, using two (2) M4 x 25.4mm
screws supplied, making sure to allow for the latch to be
centered in the strike plate.
Figure 1
Install Latch
Install Exterior Escutcheon
(4) M4 x 25.4mm
Flat Head
Combination Screws
Exterior Escutcheon
(with gasket)
Exterior of Door
Do not remove clip from Exterior Escutcheon shank until correct handing has
been determined and Exterior Lever Handle is to be installed.
(See pages 10-11)
NOTE: The "tops" of both the square drive tube and the hub (in the shank) are marked to
indicate their orientation for proper installation (Figures A & B).
Figure A
Clip
NOTE: RED marking
indicates "top" of hub
Shank
Figure B
Shank
Clip
Square Drive Tube
is marked (WHITE)
to indicate "top"
Tailpiece
(horizontal)