Operator`s manual

Operation
42
TIP:
Pre-operation checks should be made each time the watercraft is used. These checks can be
completed in a short time. It is worth the time spent to ensure safety and reliability.
UF2L20E0.book Page 42 Thursday, May 29, 2008 9:51 AM