Service manual

5-9
POWR
Power unit
23. Install the fuse box assy. O, and then
tighten the nuts P to the specified
torque.
24. Install the band Q.
25. Install the plastic ties R.
26. Connect the multifunction meter couplers
S, and then install the plastic ties T.
27. Install the service lid.
28. Connect the positive battery cable, and
then connect the negative battery cable.
29. Coat the battery cable terminals and bat-
tery terminals with water resistance
grease.
Electrical box nut P:
15 N·m (1.5 kgf·m, 11.1 ft·lb)
O
Q
P
R
T
T
S