Specifications

JET PUMP
6
JET
PUMP
6-6
JET PUMP CLEAN-OUT PORTS
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
LT
242
Step Procedure / Part Name Qty (ea.) Service Points
JET PUMP CLEAN-OUT Follow the “Step” order for removal.
TRAY REMOVAL
1 Inspection Cover 2
2 Clamp, Upper 2 Access top hose clamps through inner inspection holes,
loosen both top clamps to remove Clean-out Tray.
Clamp screw heads must be on forward (bow side) of
clean-out Hose and face center of boat (See A).
3 Screw #8 4
4 Rubber Cushion 4
5 Screw #10 14
6 Clean-out Tray 1 Apply silicone sealant to outside of clean-out port
flanges.
7 Hatch Interlock Switch 2 Set height a = 14mm (0.55”). Apply one (1) drop of
removable thread lock (LT242) to threads.
8 Clamp, lower 2 Do not need to remove unless replacing clean-out hose.
9 Hose, clean-out 2 If hose is removed, apply silicone sealant to inside of
hose at bottom, remove sealant from Cap locking
grooves in jet pump clean-out port.
10 Packing 1
11 Drain Hose 1
12 Drain Hose Clamp 1 Lift Clean-out Tray to loosen drain hose clamp and
remove drain hose.
13 Cap 2 Leave Caps in place unless jet pump clean out is
required.
NOTE: Follow Cap removal and installation instructions in JET PUMP UNIT INSPECTION,” Chapter 3.
AA