Specifications

8-26
GUNWALE
EXPLODED DIAGRAM
1
2
3
4
5
Step Procedure / Part Name Q’ty Service Points
GUNWALE Follow the “Step” order for removal.
1 Screw, 310 x 2” POH 2 Torque 2 Nm (0.2m-kg, 1.5 ft-lb)
2 Cover, rub Rail Joint 1 Before installing, apply silicone to the join
area.
3 Inner Gunwale (Rubrail insert) 1 pc Heat in warm water for installation and
gunwale indent area with a hair dryer or
low temperature heat gun.
4 Screw, #10 x 1-1/4” PFH 210 Torque 2 Nm (0.2m-kg, 1.5 ft-lb)
5 Gunwale (Rubrail) 1 pc Fill in any gaps above or below the
gunwale with white silicone.
Reverse the removal steps for installation.
REMOVAL AND INSTALLATION CHART
HULL AND DECK
8
HULL
DECK