User`s manual
1-3
1
Overview
4. Installationandoperationsequence
The basic sequence from TS-SD installation to actual operation is shown below.
· E-Gear setting
· Command pulse parameter setting
Chapter 2 ”Installation and wiring”
Chapter 4 "Data setting"
Chapter 3 "I/O signal functions"
Chapter 5 "Operation"
Chapter 6 "Troubleshooting"
Chapter 3 "I/O signal functions"
Chapter 5 "Operation"
· Machine reference
check
· Verifying that operation can be executed from the host unit.
· Operation pattern and peripheral device matching
· Command pulse adjustment
· Check by LED status indications
· Check the alarm No.
· Correct the alarm cause
Installation
Power ON
· Cable and connector wiring
and connection
· Ground connection
· Building the "emergency stop" circuit
Alarm cause correction
No
Yes
Parameter setting
Operation
Origin return
Trial operation, adjustment, teaching
Alarm occurs?
Installation and operation sequence
23103-M4-00