Service manual

ENG
ENGINE ASSEMBLY AND ADJUSTMENTS
5-34
POWER VALVE
1. Lubricate:
Power valve connecting rod
• O-rings
Gasket seal
• Bushes
(Power valve shaft contact surface)
Power valve surface
2. Install:
Power valve holder (Left)
Gasket seal
(to left power valve)
Dowel pins
Power valve (Left and right )
(to cylinder block)
Bolt (Power valve)
3. Tighten:
Bolt (Power valve)
NOTE:
When tightening the power valve connecting
bolt , lock the valve by insterting a wooden
pice into the exhaust port.
4. Install:
Power valve holder
5. Check:
Power valve operation
Unsmooth operation

Repair.
Molybdenum Disulfide Grease
Lightweight Lithium-soap base
grease
Bolt (Power Valve):
7 Nm (0.7 m•kg; 5.1 ft•lb)
Bolt (Power Valve Holder):
7 Nm (0.7 m•kg; 5.1 ft•lb)
34
2
3
2
5
2
3
1
1
2
2
1
1
4