Service manual

POWR
Power unit
5-61
69J1D11
5. Install the dipstick guide
7
, and connect
the fuel hose
8
, PTT motor leads
9
,
and flushing device hose (flushing device
model)
0
.
6. Connect the shift cable
A
and throttle
cable
B
, and then adjust their lengths.
For adjustment procedures, see Chapter
3, Checking the throttle link and throttle
cable operation, and Checking the
gearshift operation.
T
R
.
.
Mounting bolt
4
:
42 N·m (4.2 kgf·m, 30 ft·lb)
Apron and upper case cover bolt:
8 N·m (0.8 kgf·m, 5.8 ft·lb)
T
R
.
.
PTT motor lead bolt:
4 N·m (0.4 kgf·m, 2.9 ft·lb)