Service manual

5-12
E
POWR
EXHAUST PIPES 1 AND 2
EXPLODED DIAGRAM
Step Procedure/Part name Qty Service points
7 Dowel pin 2
8 Clamp/cooling water hose 2/2
È
From cooling water inlet
9Bolt 4
10 Bolt 6
11 Exhaust pipe 1 1
12 Gasket 1
13 Dowel pin 2
Reverse the removal steps for installation.
E
E
E
LT
242
LT
242
LT
242
1
9
4
8
10
12
13
6
7
5
4
4
4
2
3
11
È
È
6th 39 N m (3.9
kgf
m, 28 ft
Ib)
1st 39 N m (3.9
kgf
m, 28 ft
Ib)
2nd 22 N m (2.2
kgf
m, 16 ft
Ib)
1st 22 N m (2.2
kgf
m, 16 ft
Ib)
8 × 75 mm
3rd 35 N m (3.5
kgf
m, 25 ft
Ib)
8 × 45 mm
2nd 42 N m (4.2
kgf
m, 30 ft
Ib)
1st 15 N m (1.5
kgf
m, 11 ft
Ib)
10 × 35 mm
2nd 42 N m (4.2
kgf
m, 30 ft
Ib)
1st 15 N m (1.5
kgf
m, 11 ft
Ib)
9th 39 N m (3.9
kgf
m, 28 ft
Ib)
4th 39 N m (3.9
kgf
m, 28 ft
Ib)
7th 39 N m (3.9
kgf
m, 28 ft
Ib)
2nd 39 N m (3.9
kgf
m, 28 ft
Ib)
10th 39 N m (3.9
kgf
m, 28 ft
Ib)
5th 39 N m (3.9
kgf
m, 28 ft
Ib)
2nd 22 N m (2.2
kgf
m, 16 ft
Ib)
1st 22 N m (2.2
kgf
m, 16 ft
Ib)
8 × 125 mm
3rd 35 N m (3.5
kgf
m, 25 ft
Ib)
8th 39 N m (3.9
kgf
m, 28 ft
Ib)
3rd 39 N m (3.9
kgf
m, 28 ft
Ib)
Not reusable