Service manual

5-17
E
POWR
OIL TANK
EXPLODED DIAGRAM
Step Procedure/Part name Qty Service points
12 Clamp/cooling water hose 1/1
Ì
From cooling water inlet
13 Clamp/cooling water hose 1/1
Í
From pressure control valve
14 Bolt 1
15 Collar 1
16 Band 1
17 Bolt 3
18 Cover 1
19 Gasket 1
20 Bolt 2
21 Ground lead 2
22 Bolt 4
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
LT
572
29
28
26
25
27
26
22
20
17
18
19
16
15
21
12
23
24
5
3
4
11
1
13
10
6
8
9
5
7
2
E
6
AA
6 × 35 mm
2nd 7.6 N m (0.76
kgf
m, 5.5 ft
Ib)
1st 3.7 N m (0.37
kgf
m, 2.7 ft
Ib)
6 × 30 mm
2nd 7.6 N m (0.76
kgf
m, 5.5 ft
Ib)
1st 3.7 N m (0.37
kgf
m, 2.7 ft
Ib)
2nd 15 N m (1.5
kgf
m, 11 ft
Ib)
1st 2.0 N m (0.2
kgf
m, 1.4 ft
Ib)
3rd 39 N m (3.9
kgf
m, 28 ft
Ib)
2nd 28 N m (2.8
kgf
m, 20 ft
Ib)
1st 15 N m (1.5
kgf
m, 11 ft
Ib)
8 × 80 mm
2nd 15 N m (1.5
kgf
m, 11 ft
Ib)
1st 2.0 N m (0.2
kgf
m, 1.4 ft
Ib)
10 × 70 mm
3rd 39 N m (3.9
kgf
m, 28 ft
Ib)
7.6 N
m (0.76
kgf m, 5.5 ft Ib)
6 × 16 mm
7.6 N
m (0.76
kgf m, 5.5 ft Ib)
6 × 20 mm
7.6 N
m (0.76
kgf m, 5.5 ft Ib)
6 × 12 mm
È
Ë
Í
É
Ê
Ì
14
b
a
4
Not reusable