Service manual

5-20
POWR
E
CYLINDERS
CYLINDERS
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step Procedure/Part name Q’ty Service points
CYLINDER REMOVAL Follow the left “Step” for removal.
YPVS Refer to “YPVS”.
Cylinder head Refer to “CYLINDER HEAD”.
1 Bolt 8
NOTE:
Tighten the bolts in a crisscross pattern
and in two stages.
2 Cylinder 2
NOTE:
Install the original position.
3 Cylinder gasket 2
4 Pin 4
Reverse the removal steps for installation.
Not reusable