User Manual

BADGE
14
1
1
2
1
1
2
2
2
3
3
3
3
44
5
5
5
5
6
4
4
7
8
8
12
6
6
7
10
RM-68
13
8
6
7
8
1
2
3
4
5
Tom Rail
BADGE
8
1
2
3
4
5
14
1
1
2
1
1
2
2
2
3
3
3
3
44
5
5
5
5
6
4
4
7
8
8
12
6
6
7
10
LS82
LS60
13
6
1
2
3
4
8
6
7
Tom Rail
8 - Yamaha Marching Toms and Randall May Free Floating Lug Bridge Assembly Instructions
MQT-80234
RMLB-L
RM-68: Drilled Spacers
MQT-680234
RMLB-L
RMLB-LS82
RMLB-LS60
TOP VIEW
TOP VIEW
10": 3, 5
12": 3, 5
13": 6, 7
14": 2, 3
13": 6
14": 3
NOTE: This configuration
will be drilled for the 8"
to attach on the 10"
and 12".
10": 3, 5
12": 3, 5
13": 7
14": 2
NOTE: The badge on the 6"
and 8" drums should face
the rail or the player side
(as close as possible).
Lug casings that should
be inserted into FFLB:
Lug casings replaced
with metal bridge:
Lug casings that should
be inserted into FFLB:
Lug casings replaced
with metal bridge:
6": 4
8": 1
10": 4
12": 4
13": 6
14": 3