User Manual

CONTENTS
Mirroring Operation Check function
11 RIVAGE PM series V2.2 Supplemental Manual
PHONES popup window
The new Mirroring Operation Check function enables you to check whether DSP mirroring is
operating properly.
You can check the operation while two DSP engines are in a mirroring configuration.
Since this function virtually pauses DSP engine operation, you can use the function at the time of
system setup.
Checking example
Assuming that DSP A and DSP B are in a mirroring configuration, you can use the Mirroring
Operation Check function on DSP A to make sure that DSP B (in the standby state) will
automatically be able to take over if DSP A fails.
Starting the Mirroring Check function
1. Press the [MENU] key on the front panel of the active DSP engine.
2. Use the []/[] keys to select “Mirr Chk”.
NOTE
If the DSP engines Unit ID does not support the Mirroring Check function, “Mirr Chk” will not appear.
3. Press and hold down the [ENTER] key.
4. When “DONE” appears, you can check to confirm the DSP mirroring operation.
Exiting the Mirroring Check function
Turn the power to the two DSP engines off and then on.
If both DSP engines are set as the word clock master after mirroring occurs, one unit must be
removed from being a word clock master. Since this operation cannot be performed from the panel
of the control surface, it must be performed from the front panel of the DSP engine.
NOTE
Even if DSP B takes over for failed DSP A, DSP B will not take over DSP As word clock master
settings unless you turn off the power to DSP A.
DSP B will remain active unless you change the active DSP from B to A. If you turn the power to both
DSP engines off and on, DSP A will become active. At this time, please be aware that data currently
on DSP B will be lost unless you save the data first.
Mirroring Operation Check function
Press & Hold
[ENTER] to
Mirr Chk