GEO S12 HARDWARE SETUP PROCEDURE Page 39/112
8.3.3 Single GEO S12 cable mounted on a wall or a ceiling (vertical or horizontal)
Required items
1 or 2 x GEOS12-LBRK (allows cable suspension, holes for cable suspension are 10mm
diameter);
2 or 4 slings and corresponding shackles (not provided)
IMPORTANT
Ensure that the ceiling is strong enough to hold GEO S12 weight and that the cable
suspension system required to install the cabinet under the ceiling is properly
dimensioned.
Procedure
Vertical
Remove the four TORX screws holding connector
plate on upper side of GEO S12;
Remove the connector plate from Geo S12;
Fill each screw hole with Locktite 243 or equivalent;
Position external plate from GEOS12-LBRK kit and
secure it using the 2 of the 4 shoulder screws supplied
with this kit;
Position “L” bracket from GEOS12-LBRK kit, and
secure it to the cabinet using the 2 remaining shoulder
screws supplied with this kit.
Slings and shackles (not provided) are required to
secure the cluster under the ceiling;
Horizontal
Remove the four TORX screws holding connector
plates on both side of GEO S12;
Remove the connector plates from Geo S12;
Fill each screw hole with Locktite 243 or equivalent;
Position external plates from GEOS12-LBRK kits and
secure them using the shoulder screws supplied with
these kits;
Position “L” brackets from GEOS12-LBRK kits, and
secure them to the cabinet using the 4 remaining
shoulder screws supplied with these kits.
Slings and shackles (not provided) are required to
secure the cluster under the ceiling;