Owner's Manual

GEO S12 HARDWARE SETUP PROCEDURE Page 53/112
Alternative Procedure (“Walder” procedure)
Below described procedure required 2 additional 8x20 quick release pins (BLGEOS)
Split the GEOS12-PSBRK-V2 side plates by removing screws and bolt;
Slide GEOS12-PSBRK-V2 lower half-plates into lower GEO S12 connecting plate oblong holes;
Lock safety pins into lower GEO S12 connecting plate;
Position “U” bracket over these lower half plates; align centre holes;
Insert adjustment handles, adjust vertical angle and tight the handles to prevent GEO S12 from
rotating around “U” bracket;
Lift assembly on Wind Up stand or on RS15 with STDPS pole stand.
Slide GEOS12-PSBRK-V2 upper half-plates into upper GEO S12 connecting plate oblong holes;
Lock safety pins into upper GEO S12 connecting plate;
Lift upper GEO S12 on top of lower one, and connect them together by inserting 8x20 quick
release pins in articulation holes;
Adjust inter-cabinet angle and lock to required angle value with quick release pins.
IMPORTANT
Ensure that safety pins are properly locked into GEO S12 connecting panels.