Owner's Manual

GEO S12 HARDWARE SETUP PROCEDURE Page 59/112
8.4.8 Three or more GEO S12 flown horizontally
Required items
1 x Bumper (GEOS12-BUMPER);
N Pair of Rigging Plates (GEOS12-XBOW-V2) for N cabinets;
4xN Quick release pins for N cabinets;
1 hoist (not provided).
IMPORTANT
Maximum GEO S12 quantity for flown vertical cluster is 12 (and eventually less).
Please check Geosoft2 for mechanical Safety Working Load computations.
IMPORTANT
Motor hoist must be rated to support entire cluster weight. Please check configuration
in Geosoft2 for proper motor hoist rating
GEO S12 XBOW ANGLE SETTINGS PLATE
Optional GEOS12-TLB link bar for GEO S12 XBOW
GEOS12-XBOW-V2s are delivered with standard link bars which allow both stacked and flown setups.
However, these link bars require perfect alignment of angle setting holes when adding cabinets.
GEO S12 X-BOW STANDARD LINK BAR
3.15°
2.0°
1.25°
0.8°
0.5°
0.315°
0.2°
5.0°
6.3°
8.0°
10.0°
L
I
F
T
16.0°
22.5°
30.0°
L
I
F
T
CAUTION: ENSURE ALL PINS
ARE PROPERLY LOCKED
PROFESSIONAL EQUIPMENT !
Please refer to User Manual for Working
Load Limits (WLL) and Rigging
Instructions.
WARNING
Disregard of Rigging Instructions and/or
WLL may damage equipment and risk
personal injury or death.
S
A
F
E
T
Y
P
I
N
M
U
S
T
B
E
F
I
T
T
E
D