User Manual
Table Of Contents
- Contents
- PRECAUTIONS
- Introduction
- An overview of the CL series
- Controls and functions
- Touch screen
- Basic operation of the CL series
- Connections
- Setup
- Quick Guide
- Connecting the devices
- Setting the input channels
- Applying EQ/dynamics
- Setting the output channels
- Using GEQ
- Applying effects
- Changing the patch settings
- Grouping and linking
- Setting a custom fader bank
- Using talkback
- Routing the oscillator to an output channel
- Using scene memories
- Recording and playing audio using a USB flash drive
- Saving and loading the unit settings
- Other functions
- Troubleshooting
- Installing the MBCL meter bridge (option)
- Specifications
- Dimensions
- Index
- Block Diagram
- Level Diagram
Installing the MBCL meter bridge (option)
Owner’s Manual
55
Installing the
MBCL meter
bridge (option)
1. On the back of the CL3/CL1 console’s touch
screen, loosen screws ‘A’ (three locations) so
that they are backed-out approximately
4mm.
The CL3 has screws ‘A’ in two locations. Choose one
or the other location as appropriate for your situation.
2. Hook holes ‘B’ of the MBCL mounting strap
onto screws ‘A’ of the CL3/CL1.
3. Tighten screws ‘A’ to secure the MBCL,
starting with the upper two screws.
4. Connect the MBCL connector ‘C’ to the
METER port ‘D’ on the CL3/CL1, and fasten
the locking screws.
NOTICE
Make sure that the console and the PW800W are
powered-off before you connect the MBCL meter bridge to
the console. Failure to observe this will cause malfunction
or electric shock.
A
A
4 mm
CL3 console
A
B
A
CL3 console
A
D
C
A
CL3 console