User Manual

Installation in a rack
22 SWR2310-28GT SWR2310-18GT SWR2310-10G
2. Install the rack mount panel to the 19-inch rack.
Using the screws that are included with the 19-inch rack (EIA standard 4 pcs., JIS standard
2 pcs.), fasten this unit to the 19-inch rack. Be sure to tighten the screws so that they will not
get loosened.
You can also mount two SWR2310-10G units as shown in the figure below.
Caution
So as not to obstruct the cooling vents on the top panel of this unit, leave a gap when installing
it in a 19-inch rack.
10
9
19-inch rack
Rack mount panel
[For an EIA standard rack]
[For a JIS standard rack]
Screws supplied
with the 19-inch
rack
Screws supplied
with the 19-inch
rack
SWR2310-10G
10
9
10
9
SWR2310-10G