Operator`s manual

Operation
46
NOTE:
Pre-operation checks should be made each time the watercraft is used. These checks can be
completed in a short time. It is worth the time spent to ensure safety and reliability.
UF1K13E0.book Page 46 Wednesday, July 4, 2007 2:03 PM