Operator`s manual

4-18
E
QSTS cables (handlebar end)
Remove the QSTS cable housing. Spray
a rust inhibitor into the outer cable.
Reinstall the QSTS cable housing.
YPVS cable
Choke cable (handlebar side)
Spray the rust inhibitor into the outer
cable.
EJU00566a
Intermediate housing
Using a grease gun, fill the intermediate
housing with water-resistant grease through
the grease nipple 1.
Grease capacity:
Initial 10 hours or 1 month:
33.0–35.0 cm
3
(1.11–1.18 oz)
Every 100 hours or 6 months:
6.0–8.0 cm
3
(0.20–0.27 oz)