Service manual

5-14
POWR
E
ENGINE UNIT
SERVICE POINTS
Shim removal
1. Remove:
Shims
NOTE:
To ease reassembly and coupling align-
ment, remove the shims and organize them
in their respective groups (e.g., front right,
rear left) prior to removing the mounting
bolts.
Engine mount inspection
1. Inspect:
Engine mounts
Cracks/damage
Replace.
Coupling clearance inspection
1. Measure:
Clearance
a
Clearance
b
(with a straightedge and thickness
gauge)
Out of specification
Adjust with the
shims.
NOTE:
Before measuring the clearance, remove
the rubber damper.
Clearance
a
:
0 ~ 1.0 mm (0 ~ 0.039 in)
Clearance
b
:
2 ~ 4 mm (0.079 ~ 0.157 in)