Service manual
CHANGING THE COOLANT
CHK
ADJ
<&
9.
Fill:
8coolant reservoir
(with the recommended coolant to the
maximum level mark 1)
10.Install:
8coolant reservoir cap
11.Start the
engine,
warm it up for several
min-
utes,
and then stop it.
12.Check:
8coolant level
Refer to “CHECKING THE COOLANT
LEVEL”.
NOTE:
Before checking the coolant level, wait a few
minutes until the coolant has settled.
13.Install:
8radiator cover
Refer to”RADIATOR”in chapter 6.
8coolant reservoir cap cover
8side cover(right)
8front cover
Refer to”COVER AND PANEL”.
3-39