Operation Manual

CRANKSHAFT
5-75
Removing the connecting rods
Order Job/Parts to remove Q’ty Remarks
1 Connecting rod cap 2
2 Big end lower bearing 2
3 Connecting rod 2
4 Big end upper bearing 2
5 Circlip 2
6 Balancer piston pin 1
7 Balancer piston 1
8 Balancer connecting rod cap 1
9 Balancer big end lower bearing 1
10 Balancer connecting rod 1
11 Balancer big end upper bearing 1
For installation, reverse the removal proce-
dure.
60 Nm (6.0 m kgf, 43 ft Ibf)
T
R
.