User Manual

Command Toolbar
button
Summary Dialog box that appears
[GPI Calibration] --- Calibrates the input voltage detection range for
the [GPI] connector of the devices. (Available only
when online.)
"GPI Calibration" dialog box
[Get Log from
Devices]
--- Obtains the log from the MTX series or XMV
series units.
"Get Log from Devices"
dialog box
[Show Alert Popup] --- Specifies whether or not the popup window will
appear in ProVisionaire Design when an alert
appears on the device.
---
[RM Series
Settings]
---
[Sign up]
Specifies the initial password for the RM-CG or
RM-TT.
[Login]
Logs in to the RM-CG or RM-TT for which the
password has already been specified. You need
to log in to configure the devices in ProVisionaire
Design.
[Password Settings]
Enables you to change the password for the RM-
CG or RM-TT.
[Enable SCP remote control access]
Enables or disables control of the RM-CG or RM-
TT via the external SCP controller.
"Sign up" dialog box
"Log In" dialog box
"Password Settings" dialog
box
"Enable SCP remote control
access" dialog box
4.5. [Tools] menu
Command Toolbar
button
Summary Dialog box that appears
[Trace Signal Path] If you select a port or wire while this command is
turned on (checked), the signal path will be traced
starting from the selected point toward the output
and input.
---
[Duplicate Port
Label]
--- If you create a wire connection between ports
while this command is turned on (checked), the
name of the originating port will be copied to the
destination port.
---
4.6. [Arrange] menu
Command Toolbar
button
Summary Dialog box that appears
[Align Left Sides] Aligns the left edge to the left-most of the
multiple selected objects.
---
[Align Right Sides] Aligns the right edge to the right-most of the
multiple selected objects.
---
[Align Tops] Aligns the top edge to the highest of the multiple
selected objects.
---
4. Menu bars and toolbar
28 | ProVisionaire Design User Guide