Service manual

Table Of Contents
4. Disassembly and reassembly
103R1
(38) Filling with cooling water
1) Open the coolant (fresh water) tank cap and fill with water.
2) Fill with water until the level in the coolant recovery tank is between the full and low marks.
(39) Test running
Refer to “Adjusting operation” of 2.6 in chapter 2.
Model Engine capacity L (quart)
3YM30(C) 4.9 (5.2)
3YM20(C) 4.1 (4.3)
2YM15(C) 3.0 (3.2)
Coolant recovery tank capacity (full)
0.8 L
(0.8 quart)