Instructions / Assembly

5
Continue fastening 2x6's to 4x4's using 6 7/8" bolts.
Tighten nuts at this point. Over-tightening acorn nuts
can cause the head to pop off.
Install three floor joists.
Fasten joists to hangers using 1 3/4" washer head
screws.
Step 5:
Step 8:
Step 7:
Step 6:
Lunar Vinyl Playset Assembly Manual