Specification
6
(19) Continue until floor is com-
plete.
(21) Knock the joists on the end
accordingly, till measurements are
equal.
(20) Before proceeding, ensure
that floor is square.
Both measurements need to be
equal.
Install Flooring
(25) Nail along the gable, again;
making sure flooring is flush with
the floor joist. Use an 8” to 12” nail
spacing.
(26) Nail along the front side, mak-
ing sure flooring is flush with the
band board.
(27) Put the next piece in place,
then refer to following step.
(22) Layout the flooring as shown. (23) Start on the front left corner
with a full 4’x8’ piece, making
sure flooring is flush with floor
joists.
(24) Attach the corner of the floor-
ing, using 2” nails.
(866) 210-9273 - info@yardcraft.com










