Installation & Assembly

23
(170) Align trim flush with edge of
siding and attach, using two - 2”
trim nails spaced every12 to 14
inches.
(172) Fasten the top piece, making
sure you divide it out evenly
across the top.
(171) Repeat for the other side,
making sure the trim to trim open-
ing is 72” before nailing. Check
the measurement on the middle
and bottom as well.
(176) Install the short garage door
pack-out as shown, making sure it
is flush with the frame, using 2”
nails.
Repeat for opposite side.
(177) Install the side garage door
pack-out, making sure it is flush
with the frame.
Repeat for opposite side.
(178) Fasten the inside garage
door pack-out as shown, making
sure it is flush with outside pack-
out..
Repeat on opposite side.
(173) Install diamond plate as
shown, using two 2” nails every 10
to 12 inches.
(174) Nail poly strip just below the
diamond plate, using 2” trim nails
and dividing it out evenly from left
to right, ect.
(175) Install shutters, using six
white screws per shutter. Repeat
for other window.
(866) 210-9273 - info@yardcraft.com
Install Door Trim And Shutters
Install Garage Door Pack-outs