Installation & Assembly
4
(1) Place the package as close to
the assembly location as possible.
(3) Remove and organize parts
from package.
(2) Cut package bands.
Note: Floor unit is packaged sepa-
rately.
Unpack The Kit
If You Got A Floor With This Unit,
(Skip Steps 4-9)
(7) After all the walls are set, per-
manently anchor the walls, first; pre
-drilling the holes, using a 1/2” con-
crete bit, (Not provided) then,
moving to next step.
(8) Fasten the walls to the founda-
tion, using 1/2” x 7” galvanized
wedge anchors, (Not provided) and
space them every 4 to 6 feet, or ac-
cording to local code requirements.
(9) Ask your local hardware de-
partment for any additional info on
how to properly install the anchor-
ing system, or refer to the video at
www.youtube.com/watch?
(4) Locate and lay out the 6’ pres-
sure treated 2x4 Sill Plates, cutting
them to length as needed.
NOTE: Perimeter needs to be
square, and exactly 12’x26’
(5) Fasten the sill sealer (Not pro-
vided) to the bottom of the sill
plate. (You will need approxi-
mately 70 feet)
(6) After making sure the sill
plates are in the proper position,
pre drill holes, then fasten to the
foundation, using 3” Tapcon
screws, (Not provided)
(866) 210-9273 - info@yardcraft.com










