Specification

7
(29) Nail the front corner as
shown, making sure the flooring is
tight against previous piece, then
nail along the splice.
(30) Nail along the front side,
again; making sure flooring is
flush with the band board. Repeat
previous steps with the rest of the
front row.
(28) Center the floor joist evenly
with the flooring splice, then nail
the corner, after making sure floor-
ing is tight against, and flush with
the previous piece.
Assemble Back Wall Frame
(34) Locate and lay out the parts to
assemble the back wall.
Note: (Dados are 24” on center)
Single plate belongs towards the
bottom, and double plate towards
the top.
(31) Before you finish attaching
the first row flooring to the joist,
make marks 12” on center for a
guide to adjust the joist when nail-
ing. Then finish nailing the first
row flooring.
(32) Nail the rest of the flooring,
using the previous steps, and using
the layout shown.
(33) Finally, make sure flooring is
nailed to all floor joists, then you
are ready for wall placement.