Installation Guide

21
Install all remaining Tongue & Groove Boards at
each section, as shown in previous steps.
All Tongue & Groove Boards Installed.
Fasten Tongue & Groove Boards to Rafters at each

Align the Tongue & Groove Board to the Band

Nail.
Roof Sheeting
Locate the second longest Tongue & Groove Board
and place the Tongue into the Groove and fasten at
each end using two (2) 2’ Nails.

repeating the process shown in previous steps.
Fasten each board along both
ends using (2) 2” Nails