User Manual

24 support@yardistrystructures.com
It is important the proper hardware gets
placed in the places shown. You install the
Wafer Bolt rst and then the screws.
A:AttachoneBeamEndassemblyfromStep
8toeachCornerPostassemblywiththecut-
outsidefacingoutusingone1/4x4-1/4”Wafer
Bolt(with5/16”atwasherand1/4”connector
nut)
Step 9: Attach Beams to Corner Post Assemblies
2 x (301) Beam 81-1/2” 38.1 x 139.7 x 2070.1 mm (2 x 6 x 81-1/2”)
HardwareWood Parts
Fig. 9.2
12 x #8 x 3” Wood Screw
4 x 1/4 x 4-1/4” Wafer Bolt (5/16” at washer, 1/4” connector nut)
4 x 1/4 x 3-3/4” Wafer Bolt (5/16” at washer, 1/4” connector nut)
(301)Beam81-1/2”
BeamEnd
Assembly
Fig. 9.1
#8x3”
Wood
Screw
Cut-out
Flat
Washer
1/4x4-1/4”
WaferBolt
FlatWasher
BeamEnd
Assembly
BeamEnd
Assembly
(301)Beam
81-1/2”
PanelPost
B:Fitone(301)Beam81-1/2”
inbetweentwoCornerPost
AssembliesandattachtoBeam
EndassembliesandPanelPost
asshowning.9.1and9.2with
one1/4x3-3/4”WaferBolt(with
5/16”atwasherand1/4”con-
nectornut).
C:Attachsix#8x3”Wood
Screws.
D:RepeatStepsA,BandCto
theoppositepairofPanelCorner
PostAssembliestomakeafront
andback.
1/4x3-3/4”
WaferBolt
Note: Beams should be ush to top of posts.
Flush
Flush
Connector
Nut