Installation Guide

17 support@yardistrystructures.com
A: Pre-drill with a 1/8” drill bit and attach two L Mounts (one L Mount Right and one L Mount Left) ush to the
inside edge, at the bottom of each Panel Post with two #10 x 1-1/4” Pan Screw per L Mount as shown in g. 5.1,
5.2 and 5.3.
Step 5: Attach L - Mount Brackets
Fig. 5.1
Fig. 5.2
Hardware
16 x Room L-Mount (Right and Left)
32 x #10 x 1-1/4” Pan Screw
#10 x 1-1/4”
Pan Screw
Flush to bottom of posts
x 2 per L Mount
L Mount Left
L Mount Right
L Mount Left
L Mount Right
Note orientation of tabs.
Fig. 5.3
L Mount Right
L Mount Left
Note: Flush to the inside edge.