Installation Guide

28 support@yardistrystructures.com
A: Measure 59-1/4” from the inside of each Beam 81-1/2” and place one Trellis End Assembly on the Arch Beam
Offsets and Arch Beam Fronts. This should be centred and both ends should hang 9-3/4” over the edges. (g.
13.1 and 13.4)
B: Attach with three #10 x 4” Wood Screws in the places indicated in g. 13.1 and 13.2.
C: Attach Trellis Clip to Arch Beam Offset with two #10 x 1-1/4” Pan Screws as shown in g. 13.1 and 13.3.
Step 13: Attach Trellis End Assemblies
Part 1
Hardware
3 x #10 x 4” Wood Screw
2 x #10 x 1-1/4” Pan Screw
#10 x 4”
Wood Screw
#10 x 1-1/4”
Pan Screw
59-1/4”
59-1/4”
Beam
81-1/2”
Trellis End
Assembly
Arch Beam
Offset
Arch Beam
Front
Arch Beam
Offset
Arch Beam
Front
Trellis
Clip
Fig. 13.1
Fig. 13.2
Fig. 13.3
Beam
81-1/2”
Fig. 13.4
Trellis End
Assembly
Arch Beam
Front
Both Sides of Trellis End
Assembly
9-3/4”