Instructions / Assembly

26 support@yardistrystructures.com
It is important the proper hardware gets
placed in the places shown.
A: Attach one (080) Arch Beam Offset
through centre of grooves of Engineered
Panel Post with one #8 x 2-1/2” Wood
Screw and through Beam 81-1/2” with three
#10 x 4” Wood Screws per side shown in g.
11.1 and 11.2. Complete for two Arch Beam
Offsets.
B: In between Arch Beam Fronts and Arch
Beam Offsets, next to the Engineered Panel
Posts install four (067) Beam 20-3/4” and
attach with one #8 x 2-1/2” Wood Screw and
six #10 x 4” Wood Screws per Beam 20-3/4”
as shown in g. 11.1 and 11.2.
Step 11: Attach Arch Beam Offsets
2 x (080) Arch Beam Offset 38.1 x 241.3 x 3048 mm (2 x 6 x 120”)
4 x (067) Beam 20-3/4” 38.1 x 139.7 x 527.1 mm (2 x 6 x 20-3/4”)
HardwareWood Parts
Fig. 11.2
36 x #10 x 4” Wood Screw
8 x #8 x 2-1/2” Wood Screw
(080) Arch
Beam Offset
Fig. 11.1
#8 x
2-1/2”
Wood
Screw
Engineered
Panel Post
(080) Arch
Beam Offset
Arch Beam
Front
#10 x 4”
Wood Screw
x 3
Engineered
Panel Post
Arch Beam
Front
Arch Beam
Front
#10 x 4”
Wood Screw
x 3
#10 x 4” Wood
Screw x 3
#8 x 2-1/2”
Wood Screw
(067) Beam
20-3/4”
(067) Beam
20-3/4”
(067) Beam
20-3/4”
(067) Beam
20-3/4”
(068) Beam
81-1/2”
(068) Beam
81-1/2”