2 x 14 Pergola room Installation and Operating Instructions – YM11700 12 x 14 Arched Pergola Room YM11645 Revised 04/20/2016 12ft 3.7 M Yardistry – North America Toll Free Customer Support: 1.888.509.4382 info@yardistrystructures.com www.yardistrystructures.com Yardistry / Selwood Products – Europe Customer Support: +44 1284 852569 parts@selwoodproducts.com www.selwoodproducts.com 14 ft 4.73M HEIGHT: 8’ 8or 2.
Important Safety Notice! Yardistry components are intended for privacy, decorative and ornamental use only. Product is NOT INTENDED for the following: •A safety barrier to prevent unsupervised access to pools, hot tubs, spas or ponds. • As load bearing support for a building, structure, heavy objects or swings. •U sed in structures that trap wind, rain or snow that would create extra load on the product. Permanent structures may require a building permit.
Limited Warranty Yardistry warrants that this product is free from defect in materials and workmanship for a period of one year from the original date of purchase. In addition, all lumber is warranted for 5 years against rot and decay. This warranty applies to the original owner and registrant and is non-transferable. Regular maintenance is required to assure the integrity of your product and is a requirement of the warranty. This warranty does not cover any inspection cost.
Instructions for Proper Maintenance Your Yardistry structure is designed and constructed of quality materials. As with all outdoor products it will weather and wear. To maximize the enjoyment, safety and life of your structure it is important that you, the owner, properly maintain it. HARDWARE: • • • Check metal parts for rust. If found, sand and repaint using a non-lead paint complying with 16 CFR 1303.
Permanent Installation Examples Note: It is critically important you start with square, solid and level footings, concrete pad or deck to attach your Pergola Room. We supply Room L-Mounts with this structure which gives you the flexibility to permanently install your structure to a pre-existing or new wood or concrete surface. • The hardware to attach the Room L-Mount to the structure is included.
Permanent Installation Examples cont. Concrete Patio (min. 10’ 2” x 10’ 2”) with 12” clearance on all sides #10 x 1-1/4” Pan Screws Included Anchoring Hardware not included Wood Deck (min. 10’ 2” x 10’ 2”) with 12” clearance on all sides #10 x 1-1/4” Pan Screws Included Anchoring Hardware not included Post #10 x 1-1/4” Pan Screw Room L-Mount 6 support@yardistrystructures.
7 support@yardistrystructures.com support@yardistrystructures.
are approximate and are shown to assist in the identification of parts for Part Identification ( Dimensions ) assembly. Actual dimensions may be smaller or larger. 38.1 x 38.1 x 409.6mm 32pc. (185) - Horizontal Insert 2 x 2 x 16-1/8" - Box 1 Y50119-185 38.1 x 38.1 x 574.7mm 64pc. (183) - X Insert 2 x 2 x 22-5/8" - Box 1,2,3 Y50119-183 38.1 x 63.5 x 1699.7mm 9pc. (233) - Trellis End Short 2 x 3 x 66 15/16" - Box 2 Y50119-233 38.1 x 63.5 x 2554.8mm 9pc.
Part Identification ( ) Dimensions are approximate and are shown to assist in the identification of parts for assembly. Actual dimensions may be smaller or larger. 38.1 x 139.7 x 527.1mm 4pc. (067) - Beam 20-3/4" 2 x 6 x 20-3/4" - Box 3 38.1 x 139.7 x 870mm 4pc. (192) - Beam End 34-1/4" 2 x 6 x 34-1/4" - Box 3 Y50119-192 Y50119-067 38.1 x 139.7 x 1866.9mm 4pc. (231) - Support Beam 2 x 6 x 73-1/2" - Box 2 Y50119-231 38.1 x 241.3 x 3048.0mm 2pc. (195) - Arch Beam Front - Box 3 Y50119-195 38.1 x 241.
Hardware Identification ( Dimensions are approximate and are shown to assist in the identification of parts for assembly. Actual dimensions may be smaller or larger. ) 9pc. H2 - Hex Bolt 1/4 x 2" - (Y07427-920) 4pc. G10 - Hex Bolt 5/16 x 3" - (Y07427-330) 4pc. G5 - Hex Bolt 5/16 x 4-1/2" - (Y07427-342) 8pc. G22 - Hex Bolt 5/16 x 5" - (Y07427-350) 4pc. z - Hex Bolt 5/16 x 6" - (Y07427-360) 1pc. - 1/8" Drill Bit (Y00400-002) 94pc. - S12 Pan Screw #10 x 1-1/4" - (Y06427-911) 113pc.
Hardware Identification ( 8p c. - Dimensions are approximate and are shown to assist in the identification of parts for assembly. Actual dimensions may be smaller or larger. 8p c. LM ou nt Le ft - (Y 00 41 9-0 04 ) LM ou nt ) Rig ht - (Y 00 41 9-0 05 ) 9 pc. - 2 x 3 Trellis Clip (Y00419-003) 1 pc. - Beam Hanger (4 Pk) (Y70819-011) 11 support@yardistrystructures.
Step 1: Inventory Parts - Read This Before Starting Assembly STOP A. STOP STOP STOP his is the time for you to inventory all your hardware, wood and accessories, T referencing the parts identification sheets. This will assist you with your assembly. • Each step indicates which bolts and/or screws you will need for assembly, as well as any flat washers, lock washers, t-nuts or lock nuts. B.
Step 2: Assemble “X” Inserts A: Place one X Insert Pin into one X Insert, then attach a second X Insert to form a complete Insert. Make sure the pieces are tight to each other. B: Repeat Step A to make 32 complete Inserts. Fig. 2.1 X Insert Pin X Insert Wood Parts Hardware 64 x X Insert 38.1 x 38.1 x 574.7 mm 32 x X Insert Pin 13 support@yardistrystructures.
Step 3: Assemble 8 Panels Part 1 Fig. 3.1 (241) Engineered Panel Post Long Top Note: You will be assembling 8 Panel Post Assemblies in total in Step 3. A: Lay one (241) Engineered Panel Post Long and one (239) Engineered Panel Corner Post Long on edge so the grooved sides face each other, on a level surface. (239) Engineered Panel Corner Post Long B: Place one (191) Bottom Brace Insert in between the posts tight to the bottom ledge and attach with two #8 x 3” Wood Screws as shown in fig. 3.1.
Step 3: Assemble 8 Panels Part 2 Fig. 3.2 D: Slide one complete Insert in from the top of the panels and down to the (185) Horizontal Insert. (fig. 3.2) (241) Engineered Panel Corner Post Long Fig. 3.3 #8 x 3” Wood Screws x 5 E: Slide one (185) Horizontal Insert to the top of the complete Insert. (fig. 3.2) Attach with two #8 x 3” Wood Screws. (189) Cross Brace Insert #8 x 3” Wood Screws x 5 Note: Be sure to maintain 16” measurement between each (185) Horizontal Insert. (fig 3.
Step 4: Attach Panel Posts to Corner Posts Part 1 Fig. 4.1 (241) Engineered Panel Post Long (239) Engineered Panel Corner Post Long Note: Only pre-drill one post per assembly A: On (239) Engineered Panel Corner Post Long, per assembly, pre-drill two holes from the inside, at the places shown in fig. 4.1 and 4.2. Pre-drill in the centre of the panel and on a slight angle. Fig. 4.2 Pre-drill on a slight angle pre-drill 3 holes from the centre on a slight angle 16 support@yardistrystructures.
Step 4: Attach Panel Posts to Corner Posts Part 2 Fig. 4.3 #8 x 2-1/2” Wood Screws B: Through the pre-drilled holes attach two Panel Posts assemblies to one (235) Corner Post Long with one #10 x 4” Wood Screw per Panel Post Assembly at bottom and six #8 x 2-1/2” Wood Screws along post as shown in fig. 4.3. (235) Corner Post Long #8 x 2-1/2” Wood Screws Complete this step for all four Corner Posts. #8 x 2-1/2” Wood Screws Flush #10 x 4” Wood Screws Wood Parts Hardware 4 x (235) Corner Post Long 69.
Step 5: Attach L - Mount Brackets A: Pre-drill with a 1/8” drill bit and attach two L Mounts (one L Mount Right and one L Mount Left) flush to the inside edge, at the bottom of each Panel Post with two #10 x 1-1/4” Pan Screw per L Mount as shown in fig. 5.1, 5.2 and 5.3. Fig. 5.1 Fig. 5.3 L Mount Right Note orientation of tabs. #10 x 1-1/4” x 2 per L Mount Pan Screw L Mount Right Note: Flush to the inside edge. L Mount Left Fig. 5.
Step 6: Attach Plinths to Corner Post Assembly Part 1 A: Place one (034) Short Plinth B Assembly with one (035) Short Plinth A Assembly tight to each other and attach using two #6 x 30 mm Trim Screw at the opposite corners per Plinth. (Fig. 6.1 and 6.2) Note: Plinths will be attached to four corners. Fig. 6.1 Plinths rest on top of the L Mounts Flush to corners Fig. 6.
Step 6: Attach Plinths to Corner Post Assembly Part 2 B: On the outside of the corner post assembly, place two (033) Long Plinth Assembly tight against each other using 2 #6 x 30 mm Trim Screws per Plinth. Be sure they are flush and tight. (Fig. 6.3 and 6.4) Fig. 6.3 Fig. 6.4 (033) Long Plinth Assembly #6 x 30 mm Trim Screw x 2 per board Flush Wood Parts Hardware 8 x (033) Long Plinth Assembly 34.9 x 152.4 x 598.5 mm 16 x #6 x 30 mm Trim Screw 20 support@yardistrystructures.
Step 6: Attach Plinths to Corner Post Assembly Part 3 C: Place one (032) End Plinth Assembly onto each Corner Post Assembly. Line them up with previously placed Plinths. Make sure they are flush and tight to each other and then fasten with two #6 x 30 mm Trim Screw per end. (Fig. 6.5 and 6.6) Fig. 6.5 #6 x 30 mm Trim Screw Fig. 6.6 (032) End Plinth Assembly (032) End Plinth Assembly Flush #6 x 30 mm Trim Screw Note: Loosen screws as necessary to align all edges.
Step 6: Attach Plinths to Corner Post Assembly Part 4 Note: Make sure all plinths are lined up, flush and level before installing remaining screws. D: After the End Plinth have been placed, go back and install the two remaining #6 x 30 mm Trim Screws per end to the assembled Plinth of the Pergola Room. (Fig. 6.7 and 6.8) E: Attach 2 #6 x 30 mm Trim Screws to each end side as shown in fig. 6.7 and 6.8. Fig. 6.7 Fig. 6.
STEP 4A Step 7: Locate Corner Post Assemblies Fig. 7.1 A: Move your Corner Post Assemblies to the final location. Make sure the ground is flat and level before continuing assembly. B: Stand all four complete Corner Post Assemblies so they form a rectangle as shown in fig. 7.1. See figure 7.1 and 7.2 for accurate placements and additional measurements. 102 1/2" 78 1/2" 144" 120" 3 187 8 " Fig. 7.
Step 8: Assemble Beam Ends Fig. 8.1 10-1/2” Two Beam Ends attached on opposite side of cut-out #10 x 4” Wood Screws A: On a flat and level surface attach one (069) Beam End 10-1/2” to (192) Beam End 34-1/4” with three #10 x 4” Wood Screws as shown in fig. 8.1. B: Repeat Step A three more times so you have four assemblies. Note that two of the Beam Ends should be on the same side as the cut out and two should be on the opposite side. (fig. 8.1 and 8.
Step 9: Attach Beams to Corner Post Assemblies It is important the proper hardware gets placed in the places shown. You install the Hex Bolts first and then the screws. A: Loosely attach one Beam End assembly from Step 8 to each Corner Post assembly with the cut-out side facing out using one 5/16 x 5” Hex Bolt (with 5/16” flat washer, 5/16” lock washer and 5/16” T nut) Beam End Assembly Fig. 9.
Step 10: Attach Arch Beam Fronts It is important the proper hardware gets placed in the places shown. Make sure you install the Hex Bolts first and then the Fig. 10.1 wood screws. Corner of Corner Post Assembly A: Attach one (195) Arch Beam Front in between two Corner Post Assemblies as shown in fig. 10.
Step 11: Attach Arch Beam Offsets It is important the proper hardware gets placed in the places shown. A: Attach one (080) Arch Beam Offset through centre of grooves of Engineered Panel Post with one #8 x 2-1/2” Wood Screw and through Beam 81-1/2” with three #10 x 4” Wood Screws per side shown in fig. 11.1 and 11.2. Complete for two Arch Beam Offsets.
Step 12: Attach Arch Beam Centres Part 1 A: Attach one (079) Arch Beam Centre to each (234) Beam 105-1/2” using one Beam Hanger and eleven #10 x 1 1/4” Pan Screw per Beam Hanger (fig. 12.1 & 12.2) Fig. 12.1 #10 x 1 1/4” Pan Screw x 11 per Hanger (234) Beam 105 1/2” B: Repeat Step A for second (079) Arch Beam Centre. (fig 12.2) Beam Hanger (079) Arch Beam Centre Fig. 12.2 (079) Arch Beam Centre Wood Parts Hardware 2 x (079) Arch Beam Centre 38.1 x 241.
Step 12: Attach Arch Beam Centres Part 2 C: Centre (079) Arch Beam Centres over the pilot holes in (234) Beam 1051/2” and attach using six #10 x 4” Wood Screws per side (fig. 12.3 & 12.4) Fig. 12.3 (079) Arch Beam Centre D: Repeat Step C for second (079) Arch Beam Centre. (fig. 12.4) #10 x 4” Wood Screws (234) Beam 105 1/2” #10 x 4” Wood Screws Fig. 12.4 (234) Beam 105 1/2” (079) Arch Beam Centre #10 x 4” Wood Screws x 6 per side Hardware 12 x #10 x 4” Wood Screw 29 support@yardistrystructures.
Step 13: Attach Support Beams Part 1 A: Leaving the T-nut installed, remove the 5/16 x 6” Hex Bolt (5/16” lock washer and 5/16” flat washer) from each Beam End Assembly installed in Step 9. (fig. Step 13.1 & 13.2) 10a Fig. 13.1 Fig. 13.2 (234) Beam 105 1/2” Beam End Assembly 5/16 x 6" Hex Bolt Remove Hex Blt, Lk Washer, Flat Washer from Step 6 (Leave T-Nut Installed) 5/16 x 6” Hex Bolt (lock washer and flat washer) 30 support@yardistrystructures.
Step 13: Attach Support Beams Part 2 It is important the proper hardware gets placed in the places shown. Fig. 13.3 B: Attach one (231) Support Beam to each Beam End Assembly and (235) Engineered Panel Corner Post Long by replacing the 5/16 x 6” Hex Bolt (lock washer and flat washer) removed in Part 1. (fig 13.3 & 13.4) Ensure the cut outs in the boards are interlocking as shown in fig. 13.5.
Step 13: Attach Support Beams Part 3 Fig. 13.6 D: Attach (231) Support Beams to (234) Beam 105 1/2” using sixteen #8 x 2 1/2” Step Wood Screws per side as shown in fig.13.6 & 13.7. 10C Fig. 13.7 Fig. 13.7 #8 x 3" WS x12 (234) Beam 105 1/2” #8 x 2½" WS x20 (231) Support Beam #8 x 2 1/2” Wood Screws x 16 per side Hardware 32 x #8 x 2 1/2” Wood Screws 32 support@yardistrystructures.
Step 14: Assemble Trellis Ends A: On a flat and level surface, fit together one (233) Trellis End Short and one (232) Trellis End Long. (fig. 14.1) B: Place one Trellis Clip over the joined ends and attach with one 1/4 x 2” Hex Bolt (with two 1/4” flat washer and 1/4” lock nut). (fig. 14.2) C: Repeat Steps A and B until there are 9 Trellis End Assemblies. Fig. 14.1 (232) Trellis End Long (233) Trellis End Short (232) Trellis End Long Trellis Clip 1/4” Flat Washer Fig. 14.
Step 15: Attach Trellis End Assemblies Part 1 A: Measure 59-1/4” from the inside of each (234) Beam 105-1/2” and place one Trellis End Assembly on the (080) Arch Beam Offsets, (079) Arch Beam Centres and (195) Arch Beam Fronts. This should be centred and both ends should hang 9-3/4” over the edges. (fig. 15.1 and 15.4) B: Attach with five #10 x 4” Wood Screws in the places indicated in fig. 15.1 and 15.2. C: Attach Trellis Clip to (079) Arch Beam Centre with two #10 x 1-1/4” Pan Screws as shown in fig. 15.
Step 15: Attach Trellis End Assemblies Part 2 D: Starting at the centre Trellis End Assembly and working outwards attach four Trellis End Assemblies on either side alternating each Trellis End Assembly so the Trellis Clip is on opposing sides to the assemblies next to it. (fig. 15.5) Note: The distance between assemblies should be 12” (fig. 15.6) Note: Refer to previous page, fig 15.2 and 15.3 for attaching trellis clip. Fig. 15.
Step 16: Attach Left and Right Arch Gussets Part 1 Note: The bevelled ends on each Arch Gusset should always face away from the wood it is attaching to. A: At two corners of the assembly attach one (194) Arch Gusset Left to the (241) Engineered Panel Post Long with one #8 x 3” Wood Screws and flush to the inside, bottom edge of the (079) Arch Beam Front with two #8 x 2-1/2” Wood Screws as shown in fig. 16.1 and 16.2. These should be opposing corners.
Step 16: Attach Left and Right Arch Gussets Part 2 Note: The bevelled ends on each Arch Gusset should always face away from the wood it is attaching to. C: Attach one (237) Arch Gusset Right Long or one (236) Arch Gusset Left Long to the remaining (241) Engineered Panel Post Longs using two #8 x 3” Wood Screws and to the (234) Beam 105 1/2” with three #8 x 2-1/2” Wood Screws as shown in fig. 16.3 and 16.4.
NOTES 38 support@yardistrystructures.
NOTES 39 support@yardistrystructures.
YARDISTRY Consumer Registration Card First Name Initial Last Name Street Apt. No.