Assembly Manual

15
GABLE END
WALL
GABLE DOOR
WALL
BACK WALL
BACK WALL
Check the oor frame is level after installing oor panels.
Re-level if needed.
HINT:
IMPORTANT!
• The oor should be used as a stable work surface for wall construction.
Organize your assembly procedure during the build process
to avoid over-handling of the walls.
FRONT WALL
(Your door location may vary.)
DOUBLE
DOOR
SINGLE
DOOR