Assembly Manual
HINT:
For easier nailing
stand on frame.
23
FRONT WALL WITH DOOR LEFT
PARTS REQUIRED:
3" (7,6 cm)
x60
x2
2 x 4 x 80" (5,1 x 10,2 x 203,2 cm)
TK
TOENAILING
x2
2 x 4 x 8-1/2" (5,1 x 10,2 x 21,6 cm)
CPA
x2
2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm)
YFA
3
x1
2 x 4 x 35" (5,1 x 10,2 x 88,9 cm)
QT
60"
(152,4 cm)
83-1/4"
(211,5 cm)
108"
(274,3 cm)
108"
(274,3 cm)
120"
(337,2 cm)
132-3/4"
(304,8 cm)
12"
(30,5 cm)
32"
(81,3 cm)
QT
3" (7,6 cm)
Nails
3" (7,6 cm)
Nails
Two nails at
each location.
YFA
TK
TK
Window Frame
Assemblies
Install QT rst!
2
Place Sub-Assembly in frame as shown. Measure and mark.
Use two 3" nails at each mark and four 3" nails at seam.
Orient door frame parts on edge on oor as shown. Measure and mark.
Install QT fi rst. Use two 3" nails at each mark as shown.
Hold Seam
Flush
CPA
84-3/4"
(215,3 cm)
59-1/4"
(151,5 cm)
35-1/4"
(89,5 cm)
You have nished your front wall frame.
FINISH
x2
Window Frame Assembly










