Assembly Manual

HINT:
For easier nailing
stand on frame.
29
FRONT WALL WITH DOOR RIGHT
PARTS REQUIRED:
3" (7,6 cm)
x60
x2
2 x 4 x 80" (5,1 x 10,2 x 203,2 cm)
TK
TOENAILING
x2
2 x 4 x 8-1/2" (5,1 x 10,2 x 21,6 cm)
CPA
x2
2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm)
YFA
3
x1
2 x 4 x 35" (5,1 x 10,2 x 88,9 cm)
QT
60"
(152,4 cm)
83-1/4"
(211,5 cm)
108"
(274,3 cm)
12"
(30,5 cm)
32"
(81,3 cm)
QT
3" (7,6 cm)
Nails
3" (7,6 cm)
Nails
Two nails at
each location.
YFA
TK
TK
Window Frame
Assemblies
Install QT  rst!
2
Place Sub-Assembly in frame as shown. Measure and mark.
Use two 3" nails at each mark and four 3" nails at seam.
Orient parts on edge on  oor as shown. Measure and mark.
Install QT fi rst. Use two 3" nails at each mark as shown.
Hold Seam
Flush
CPA
You have  nished your front wall frame.
FINISH
x2
Window Frame Assembly
108"
(274,3 cm)
120"
(337,2 cm)
84-3/4"
(215,3 cm)
59-1/4"
(151,5 cm)
35-1/4"
(89,5 cm)
132-3/4"
(337,2 cm)