Assembly Manual
38
PARTS REQUIRED:
GABLE END WALL
Secure using 2" nails 6" apart on edges.
Place right 48 x 84" panel ush to left panel with primed side up.
3
3-1/2"
(8,9 cm)
You have nished building your gable end wall.
FINISH
4
Carefully ip the gable wall over.
Remove temporary supports.
48 x 84"
(121,9 x 213,4 cm)
x1
Flush
Flush
6"
(15,2 cm)
3-1/2"
(8,9 cm)
48"
(121,9 cm)
Primed
side up
x16
2" (5,1 cm)
x13
1-1/2" (3,8 cm)
1-1/2"
(3,8 cm)
Nails
2" (5,1 cm)
Nails
2" (5,1 cm)
Nails










